SL No | Name of Projects | Clients | Nature of Work | Period |
---|---|---|---|---|
01 | Sirajgonj TownProtection Projects on Jamuna River. Sirajgonj Bangladesh | Bangladesh Water Development Board (BWDB) | @River training including, Inspection, Monitoring of Construction Materials on river bed. | @From 24April to 25 Oct 2010 |
02 | Century Beel Project, Narail, Bangladesh | Asian Development Bank(ADB) | Riverbank Protection Work, Inspection and Reporting | 23 May to 15 Sep2010 |
03 | Riverbank and Wave protection WorkFeasibility Wok, Assam, India. | ADB | Pre-work and Post work Inspection and reporting. | 10 April to 21 April 2010 |
04 | Jamuna-Meghna River Erosion Mitigation Project (JMREMP)Package P-8 & P-9,Kaizuri, Pabna. | Resource Plan and Management Consultant, BWDB | Post- work Inspection and reporting. | August 2009 to June 2010 |
05 | Jamuna-Meghna River Erosion Mitigation Projects (JMREMP), MDIP-Motlab, Chandpur and PIDPPabna. | Northwest Hydraulic Consultant (nhc), Canada and BWDB | River training WorkGeo-textile Panel dumping, Geo-bag Dumping, Construction of Falling apron, Inspection, monitoring and Reporting | 17 March 2003 to June 2006 (Continuously) |
06 | Padma Multipurpose Bridge Design Project | Maunsell/Aecom, New Zealand | River training Feasibility study work, Sample collection, and | Jan 2009 to Feb 2010 |
07 | Chandpur Irrigation Project (CIP) on the Bank of River Meghna | BWDB, Chandpur. | River training wok for Bank protection, Inspection Monitoring and Reporting. | Nov 2008 to June 2011 |
08 | River Bank Protection Project (RBPP) Cr.2791BD. On the Bank of Jamuna River,Sariakandi, Bogra | Sir William Halcrow & Partnersltd. UK. Finance by World Bank | Underwater River Bank Protection Work Inspection and Reporting | March 1997 to July 1998 |
09 | Operation & Maintenance of Riverbank Protection project Bogra & Sirajgong.(Jamuna River Right Bank) | BWDB, Financed by World Bank (IDB credit) | UnderwaterInspection, Monitoring and Reporting | Feb 1999 to Dec 2000. |
10 | Townprotection Project, Sirajgonj on the Bank of Jamuna River. | Sir William Halcrow & Partnersltd. UK. | UnderwaterInspection and Reporting. | Sep. 1998 to July 1999 |
11 | 110MW Barge Mounted Power Plant, Horipur, Narrayngonj. | OGDEN Bangladesh Operating ltd. USA. | Barge Hull and Basin Bed Inspection and Reporting | July 2000. |
12 | Wilderness Conservation Research Project Underwater Reef Survey Study project. At Saint Martin Island, Teknaf, Cox’s Bazar | Institute of Marine Science and Fisheries University of Chittagong, Finance by UNDP. | Diving Support by Equipment and Guide Diver | Nov 2007 to March 2008. |
13 | Study project Reef Survey & Conservation at Saint Martin Island, Bay of Bengal. | University of Chittagong, University of Karachi and British Council | Diving Support by Equipment and Guide Diver | Feb 2009. |
14 | Sub-Marine Cable line Project | Otronix Sub Sea Pte Ltd.Singapore. | Cable Burial Work | May-Jun 2005 |
15 | Underwater Dredging work of Power Barge Basin | Covanta Bangladesh Operating Ltd. | Pump Mounted Dredging by diving operation and Reporting | Nov 2006 to May 2007 |
16 | UnderwaterInspection of Meghna and Gomoti Bridge | JPZ- SDN BHD Malaysia and R & H Bangladesh | Inspection and Reporting | May 2010 |
17 | Intake Channel Cleaning and River basin Dredging Work at Horipur 360 MW Combine Cycle Power Plant. | AES USA, Globeleq UK and Pendekar Malaysia. | Debris Cleaning, Inspection of Cathodic System, and Silt Removal wok by divers and reporting. | Every year during outage of Plant from 2001 to 2011. |
18 | Underwater Dredging work of Power Barge Basin | Pendekar energy and NEPC Consortium Power Ltd. | Pump Mounted Dredging by diving operation and Reporting | May 2012 to Oct 2012 |
19 | Brahmaputra Right bank Priority Works, Contract-B1. Sariakandi, Bogra. | EPC Engineering and Planning Consultant Ltd. Dhaka and BWDB | Underwater dredged Profile Inspection, Underwater Geo-textile Fascine Inspection, Underwater CC Block Armoring anomalies Inspection and Ballasting Inspection During Construction. | April 01, 1997 to Jun 30, 1998. |
20 | River Bank Protection Project (Sirajgonj Revetment, Kalitola Groyne, Mathurapara and Sariakandi Hard Point) | BRE (Specialized Project) O & M Division, BWDB, Srajgonj. | Underwaterinspection and monitoring works during construction and Reporting | April 04 1999 to May 02 1999 |
21 | Construction Of Bhairab Bridge. | Halcrow Group Ltd in association with i) Bangladesh Consultant Ltd. Ii) Engineering Science Ltd. | i) UnderwaterInspection to check dredged revetment slope and apron prior to the Geo-textile fascine mattress installation. ii) UnderwaterInspection of lying of Geo-textile fascine mattress on formation area. iii) Underwaterinspection of armoring and distribution of boulder stone on Geo-textile fascine mattress. Iv) Underwaterinspection of Geo-textile protection and armoring around the Rail bridge and Road bridge Pier. | Feb 01, 2001 to May 31, 2002. |
22 | Natural resource survey and conservation of the Saint Martin’sIsland | ISABELA Foundation, Dhaka | Underwater Inspection and sample collection for natural resource survey and other related activities under ecosystem-based development, management and conservation of the Saint Martin’sIsland. | Oct -2018 To Nov-2019 |
23 | CWP Basin Inspection, Maintenance and Intake outside river basin cleaning at HPL. Narrayngonj | Pendekar Energy Haripur Power Ltd. 360 MW CCPP. | Underwater Inspection, CWP Basin Cleaning including coarse Bar screen space and River Basin at Horipur Power Plant, During Annual Maintenance for every year. | From 2001 to 2019. |
24 | Scientific research on seaweed study around Saint Martin’s Island. | Bangladesh Oceanograp hic Reseach Institute, Cox’Bazar | Procurement of Diving, Snorkelling, Seaweed Sampling & Underwater photography (video and still) with Related Others Services for scientific research on seaweed study around Saint Martin’s Island. | From 2018 to 2019. |
25 | Inspection Cleaning and Stop Gate leakage protection on Water Intake. | Samsung C & T Corporation Engineering & Construction Group. | Inspection and Cleaning Work for Stop Gate leakage protection on Water Intake at 335MW CCPP Siddhirganj Power House, Narayanganj. | August 2018. |
26 | Underwater Diving Inspection with Video Survey | Summit Meghnaghat Power Company Ltd 337MW/305MW Dual Fuel CCPP | Underwater Inspection and Video Survey For CWP Basin, CWP Inlet Pipe Line, Stop Gate and Coarse Bar Screen. | September 2018. |
27 | Underwater Video survey for M/V Naess Abdolute | EXPERT MARINE SHIPING, South Africa | Underwater Inspection and Video Survey, Bulk Carrier at Inani, Bay of Bengal | July 2017. |
28 | Underwater Search and Recovery of Anchor Chain | M/V.ASPEN | Underwater Search and Recovery of Anchor Chain at kutubdia Bay of Bengal | April, 2019. |
29 | Diving Inspection on propeller shafts for the vessel Svitzer Chittagong | Svitzer Asia Pte. Ltd | Diving inspection on Propeller Shaft and Brackets and Secure the broken brackets with propeller shaft by using lifting sling at Chittagong Boat Club. | August, 2018. |
30 | Inspection and Dideography on vessel hull for the vessel Svitzer Chittagong | Svitzer Asia Pte. Ltd | Inspection and ideography on vessel hull, entanglementremove for the vessel Svitzer Chittagong at Cox’Bazar Channel | January, 2019. |
31 | Inspection and secured propeller with kort nozel by lashing arrangement for the vessel Svitzer Rangpur | Svitzer Asia Pte. Ltd | Inspection and secured propeller with kort nozel by given lashing design for the vessel Svitzer Rangpur at Dry-dock, Chittagong. | August,2019 |
32 | Underwater Inspection and video survey for Svitzer Chittagong and Rangpur | Svitzer Asia Pte. Ltd | Inspection of vessel hull and video survey i.e paint condition, propeller, Anodes, Thruster,Vertical Bottom, Sea Chest and Sea growth for Svitzer Chittagong and Rangpur at Cox’Bazar Deep sea channel | January, 2020 |
© 2020 bddivers. All rights reserved | Design by : E A STERN IT