SL No Name of Projects Clients Nature of Work Period
01 Sirajgonj TownProtection Projects on Jamuna River. Sirajgonj Bangladesh Bangladesh Water Development Board (BWDB) @River training including, Inspection, Monitoring of Construction Materials on river bed. @From 24April to 25 Oct 2010
02 Century Beel Project, Narail, Bangladesh Asian Development Bank(ADB) Riverbank Protection Work, Inspection and Reporting 23 May to 15 Sep2010
03 Riverbank and Wave protection WorkFeasibility Wok, Assam, India. ADB Pre-work and Post work Inspection and reporting. 10 April to 21 April 2010
04 Jamuna-Meghna River Erosion Mitigation Project (JMREMP)Package P-8 & P-9,Kaizuri, Pabna. Resource Plan and Management Consultant, BWDB Post- work Inspection and reporting. August 2009 to June 2010
05 Jamuna-Meghna River Erosion Mitigation Projects (JMREMP), MDIP-Motlab, Chandpur and PIDPPabna. Northwest Hydraulic Consultant (nhc), Canada and BWDB River training WorkGeo-textile Panel dumping, Geo-bag Dumping, Construction of Falling apron, Inspection, monitoring and Reporting 17 March 2003 to June 2006 (Continuously)
06 Padma Multipurpose Bridge Design Project Maunsell/Aecom, New Zealand River training Feasibility study work, Sample collection, and Jan 2009 to Feb 2010
07 Chandpur Irrigation Project (CIP) on the Bank of River Meghna BWDB, Chandpur. River training wok for Bank protection, Inspection Monitoring and Reporting. Nov 2008 to June 2011
08 River Bank Protection Project (RBPP) Cr.2791BD. On the Bank of Jamuna River,Sariakandi, Bogra Sir William Halcrow & Partnersltd. UK. Finance by World Bank Underwater River Bank Protection Work Inspection and Reporting March 1997 to July 1998
09 Operation & Maintenance of Riverbank Protection project Bogra & Sirajgong.(Jamuna River Right Bank) BWDB, Financed by World Bank (IDB credit) UnderwaterInspection, Monitoring and Reporting Feb 1999 to Dec 2000.
10 Townprotection Project, Sirajgonj on the Bank of Jamuna River. Sir William Halcrow & Partnersltd. UK. UnderwaterInspection and Reporting. Sep. 1998 to July 1999
11 110MW Barge Mounted Power Plant, Horipur, Narrayngonj. OGDEN Bangladesh Operating ltd. USA. Barge Hull and Basin Bed Inspection and Reporting July 2000.
12 Wilderness Conservation Research Project Underwater Reef Survey Study project. At Saint Martin Island, Teknaf, Cox’s Bazar Institute of Marine Science and Fisheries University of Chittagong, Finance by UNDP. Diving Support by Equipment and Guide Diver Nov 2007 to March 2008.
13 Study project Reef Survey & Conservation at Saint Martin Island, Bay of Bengal. University of Chittagong, University of Karachi and British Council Diving Support by Equipment and Guide Diver Feb 2009.
14 Sub-Marine Cable line Project Otronix Sub Sea Pte Ltd.Singapore. Cable Burial Work May-Jun 2005
15 Underwater Dredging work of Power Barge Basin Covanta Bangladesh Operating Ltd. Pump Mounted Dredging by diving operation and Reporting Nov 2006 to May 2007
16 UnderwaterInspection of Meghna and Gomoti Bridge JPZ- SDN BHD Malaysia and R & H Bangladesh Inspection and Reporting May 2010
17 Intake Channel Cleaning and River basin Dredging Work at Horipur 360 MW Combine Cycle Power Plant. AES USA, Globeleq UK and Pendekar Malaysia. Debris Cleaning, Inspection of Cathodic System, and Silt Removal wok by divers and reporting. Every year during outage of Plant from 2001 to 2011.
18 Underwater Dredging work of Power Barge Basin Pendekar energy and NEPC Consortium Power Ltd. Pump Mounted Dredging by diving operation and Reporting May 2012 to Oct 2012
19 Brahmaputra Right bank Priority Works, Contract-B1. Sariakandi, Bogra. EPC Engineering and Planning Consultant Ltd. Dhaka and BWDB Underwater dredged Profile Inspection, Underwater Geo-textile Fascine Inspection, Underwater CC Block Armoring anomalies Inspection and Ballasting Inspection During Construction. April 01, 1997 to Jun 30, 1998.
20 River Bank Protection Project (Sirajgonj Revetment, Kalitola Groyne, Mathurapara and Sariakandi Hard Point) BRE (Specialized Project) O & M Division, BWDB, Srajgonj. Underwaterinspection and monitoring works during construction and Reporting April 04 1999 to May 02 1999
21 Construction Of Bhairab Bridge. Halcrow Group Ltd in association with i) Bangladesh Consultant Ltd. Ii) Engineering Science Ltd. i) UnderwaterInspection to check dredged revetment slope and apron prior to the Geo-textile fascine mattress installation. ii) UnderwaterInspection of lying of Geo-textile fascine mattress on formation area. iii) Underwaterinspection of armoring and distribution of boulder stone on Geo-textile fascine mattress. Iv) Underwaterinspection of Geo-textile protection and armoring around the Rail bridge and Road bridge Pier. Feb 01, 2001 to May 31, 2002.
22 Natural resource survey and conservation of the Saint Martin’sIsland ISABELA Foundation, Dhaka Underwater Inspection and sample collection for natural resource survey and other related activities under ecosystem-based development, management and conservation of the Saint Martin’sIsland. Oct -2018 To Nov-2019
23 CWP Basin Inspection, Maintenance and Intake outside river basin cleaning at HPL. Narrayngonj Pendekar Energy Haripur Power Ltd. 360 MW CCPP. Underwater Inspection, CWP Basin Cleaning including coarse Bar screen space and River Basin at Horipur Power Plant, During Annual Maintenance for every year. From 2001 to 2019.
24 Scientific research on seaweed study around Saint Martin’s Island. Bangladesh Oceanograp hic Reseach Institute, Cox’Bazar Procurement of Diving, Snorkelling, Seaweed Sampling & Underwater photography (video and still) with Related Others Services for scientific research on seaweed study around Saint Martin’s Island. From 2018 to 2019.
25 Inspection Cleaning and Stop Gate leakage protection on Water Intake. Samsung C & T Corporation Engineering & Construction Group. Inspection and Cleaning Work for Stop Gate leakage protection on Water Intake at 335MW CCPP Siddhirganj Power House, Narayanganj. August 2018.
26 Underwater Diving Inspection with Video Survey Summit Meghnaghat Power Company Ltd 337MW/305MW Dual Fuel CCPP Underwater Inspection and Video Survey For CWP Basin, CWP Inlet Pipe Line, Stop Gate and Coarse Bar Screen. September 2018.
27 Underwater Video survey for M/V Naess Abdolute EXPERT MARINE SHIPING, South Africa Underwater Inspection and Video Survey, Bulk Carrier at Inani, Bay of Bengal July 2017.
28 Underwater Search and Recovery of Anchor Chain M/V.ASPEN Underwater Search and Recovery of Anchor Chain at kutubdia Bay of Bengal April, 2019.
29 Diving Inspection on propeller shafts for the vessel Svitzer Chittagong Svitzer Asia Pte. Ltd Diving inspection on Propeller Shaft and Brackets and Secure the broken brackets with propeller shaft by using lifting sling at Chittagong Boat Club. August, 2018.
30 Inspection and Dideography on vessel hull for the vessel Svitzer Chittagong Svitzer Asia Pte. Ltd Inspection and ideography on vessel hull, entanglementremove for the vessel Svitzer Chittagong at Cox’Bazar Channel January, 2019.
31 Inspection and secured propeller with kort nozel by lashing arrangement for the vessel Svitzer Rangpur Svitzer Asia Pte. Ltd Inspection and secured propeller with kort nozel by given lashing design for the vessel Svitzer Rangpur at Dry-dock, Chittagong. August,2019
32 Underwater Inspection and video survey for Svitzer Chittagong and Rangpur Svitzer Asia Pte. Ltd Inspection of vessel hull and video survey i.e paint condition, propeller, Anodes, Thruster,Vertical Bottom, Sea Chest and Sea growth for Svitzer Chittagong and Rangpur at Cox’Bazar Deep sea channel January, 2020

© 2020 bddivers. All rights reserved | Design by : E A STERN IT